Methods, all states › Texas
Water Ledger methods: Texas
Model version 1.17 · data snapshot 2026-11-25 · two-page brief (PDF) · snapshot manifest
Texas has a calculator on waterledger.org. The same data and estimates are available through the open waterledger Python packages, for example wl.place("Austin city, TX"). Proposals and moratoria are tracked from public sources and checked against local documents where they can be found; each entry says when it rests on a news report.
Estimates
For any city, town, village, township or county in Texas, Water Ledger estimates the water a data center campus of a given size and cooling design would withdraw, consume and return on an average day and on a 1-in-10-year peak day, and compares it with the local water system, sewer plant, downstream waters and electric utility. Everything in Water Ledger comes from public records, published sources and our own models. No client work or data appears here.
Data
| Source | In Texas | |
|---|---|---|
| Places | Census TIGERweb: incorporated places, county subdivisions that are governments, and counties | 1,481 (1,227 cities, towns and villages; 254 counties) |
| Water supply | EPA community water system service areas, with SDWIS population and connections | 4,582 systems (95% of places have one mapped) |
| Wastewater | EPA Clean Watersheds Needs Survey 2022 (design flow), matched to ECHO (recent flow, receiving water; active permits); ECHO's sewer plants the survey lacks | 1,779 plants (99.3% of places within 40 km of one) |
| Receiving waters | USGS Watershed Boundary Dataset; EPA ATTAINS (TCEQ, 2026 report) | 1,139 downstream paths through 3,086 watersheds |
| Weather | ERA5 hourly reanalysis, 1995–2024, by 0.25° cell, corrected near the shore toward NOAA ISD and ECCC stations | 616 cells |
| Climate | NOAA Atlas 14 design storms; NOAA Climate at a Glance rainfall; NOAA ISD stations by NOAA climate division for road-salt days | 10 climate divisions |
| Energy | HIFLD retail service territories (PNNL copy); EIA-861 sales and peaks; EIA-923 plant reports for power-plant water | 151 utilities; grid regions EPE, ERCO, MISO, PNM, SWPP |
Overall method (all states)
- Weather. Hourly ERA5 reanalysis (Copernicus Climate Change Service, read from Open-Meteo's open copy), 1995–2024, for the 0.25° grid cell holding each place. Where that cell is less than half land, the place takes the nearest cell that is at least half land. Every cell's temperature and dew-point depression are corrected by quantile mapping, by calendar month and 3-hour block of the day, toward hourly records at up to four weather stations within 100 km (NOAA ISD, and Environment and Climate Change Canada near the border), weighted by inverse distance squared. Cells less than 90% land run cool next to shore stations, so they are corrected only toward stations that are themselves on the shore; cells at least 90% land, only toward stations inland. A cell with no such station keeps ERA5 as it is. Hybrid and assist estimates depend on the hottest hours and so are the ones the weather source moves most.
- Cooling water. Hourly temperature and humidity drive the heat rejected by the campus under four cooling designs: cooling towers; hybrid, evaporative in warm weather only; dry coolers with adiabatic pre-cooling above a switch point that follows the loop's temperature, an operator's setting [A]; and closed loop with no evaporative cooling. Evaporation is the heat load times the evaporative fraction of Rutberg et al. (2011), as used in the USGS cooling tower method. Blowdown and drift together are evaporation divided by cycles of concentration minus one (DOE FEMP). Drift is a fraction of circulating flow. Cycles are sampled from 3 to 6, from the studies of data center cooling (Lei and Masanet; Han et al.), above the two to four FEMP calls typical, since it says six or more is possible [A]; 2 to 4 would take about 17% more water, as blowdown. A hybrid is fully evaporative at each location's own 0.4% design dry-bulb. Pads run at full effectiveness above the switch point; a controller that wet them only as needed would evaporate less, 12–41% on average and 2–8% on the peak day by climate at model 1.6 [A]. How the cooling plant moves heat to these designs, the three plant setups the calculator offers and their combinations: how a data center is cooled.
- Uncertainty. Each estimate is 400 runs on a Latin hypercube, sampling the cooling parameters from published or estimated ranges; estimated ranges are marked [A]. We report the 10th, 50th and 90th percentiles, the range across assumptions, which is not a probability that the real value falls inside. Hybrid and assist results are noisy at 400 draws: on average days the median is good to about 10%, and the low end to about 42% in cool climates, where it is about 0.01 million gallons a day and should read as near zero. The peak day is the 1-in-10-year maximum day, taken as the 90th percentile of the annual maximum daily withdrawal, at average load over a load factor of 0.88–0.94. With every computer at capacity all day, an upper case in the package, it is about 1.4 times that for the evaporating designs. The middle estimate takes water withdrawn and wastewater at their medians, and water evaporated is the remainder, so the books close.
- Other water. Staff use, 10–30 gallons a person a day, scaled to the number of people on site; maintenance and cleaning, up to 2,000 gallons a day plus 2–20 per MW, bracketed by applicants' projections; make-up water for closed loops, which lose 1–5% of their volume a year to leaks; and water that moves with outside air, 100–1,500 cfm per MW [A]: condensate from humid air joins the wastewater, and humidifiers, sampled from none to all [A], add water in very dry air.
- Water source. If a community water system is mapped in the place, the campus is served by it. Where several are mapped, the comparison uses one covering at least half of the place (the largest share if more than one), otherwise the largest by population among those covering at least 5%, otherwise the largest by population [A]. Where that system has under 100 connections and covers under half of the place [A], no percent is shown, and the page says a campus would need a larger supply. Another system covering at least a quarter of the place is named; the percent stays the main system's. If none covers 5% of the place, a closed loop connects to the nearest system serving more than 3,300 people when the edge of its service area is within 10 km. All other cases use new wells.
- Wastewater. Discharge goes to the nearest sewer plant if it is within reach and, for evaporative designs, has enough unused capacity for the blowdown. Otherwise closed loops use an on-site septic system and evaporative designs discharge directly.
- Homes. A home is the state's own water to homes over its households, USGS and the Census for 2015, indoors and out. EPA's figure of more than 300 gallons a day is a family's, a different basis.
- Runoff, sediment, phosphorus and nitrogen. Phosphorus and nitrogen by land cover: on developed land and the campus, the Simple Method with one concentration for the whole site from national outfall data, and natural land's yield below the pervious part; on farm fields, USDA's modeled loss per acre by region; on natural land, measured basin yields. Two cases everywhere: no controls and typical stormwater ponds that keep a permanent pool of water (wet ponds). These cover only the change in runoff from the finished site, and a study of the site can move them a lot. Sediment today on farm fields and woods is a yield, the state's cropland erosion (USDA NRI 2022) or EPA's natural range for woods, times a delivery ratio [A], because runoff concentrations miss soil scoured off the ground. Construction is EPA's gross erosion times a delivery ratio [A], with and without sediment basins; the gross erosion itself is shown separately and isn't comparable with today. Road salt comes from each location's cold wet days. These are screening estimates: a study with site soils and slopes would do better.
- Downstream. The place's main HUC-12 watershed is traced downstream for up to 25 watersheds, across state lines where needed, with the EPA-listed impairments and TMDLs for each.
- Not counted. The calculator covers the campus's water, electricity and runoff on the site. It does not count new water or sewer connections, power lines, access roads or other construction beyond the site.
- Electricity use. Worked out hour by hour from the same weather and heat balance as the cooling water, after Lei and Masanet (2022): computers, power losses, fans that slow to the air the hour needs, pumps, and chillers when outside air is too warm. So it varies by place and design. Some inputs are assumptions, marked [A], including how much of a campus is liquid-cooled. The peak is every computer running in the hottest hour of a typical decade. The base overhead every design shares, uninterruptible power supplies at 0.90–0.99 efficiency (Lei and Masanet; LBNL 2024), distribution losses, lighting and air handler fans, puts a campus on cooling towers at a yearly PUE of about 1.14–1.18. That is above the largest operators' fleets (Google about 1.09, Meta 1.08) and below Uptime Institute's 2025 survey average for sites of 20 MW or more (1.44). It is kept as a planning estimate [A]; it moves every design together, so it does not change the difference between them.
- Electricity. The utilities whose territories cover the place, their sales and peak loads, and the water consumed per kWh by each state's power plants: their 2024 reports to EIA, with published factors (Macknick et al. 2012) where a report is implausible or missing, weighted for power the state imports, and updated with 2022 reports and Siddik et al. (2024) on the same basis. Power plant water is reported separately from on-site use. It is the water that cools thermoelectric plants, from their reports to EIA (Form EIA-923); evaporation from hydropower reservoirs is not counted. Each state's page gives its grid regions both ways. In Western states, counting reservoirs can reverse the comparison of dry cooling with towers. A reported peak below a utility's average load cannot be right and counts as missing. Utilities from the national retail territory layer are ordered by number of customers, because it draws many small utilities as whole counties.
- State layers. A state can add its own data and rules (reported water use, domestic wells, coldwater streams, state rules) on top of this method. The calculator is a what-if: limits never change a number. Where a state's rules are reviewed, a legal line is context, with a flag when the estimate exceeds it. Where they aren't, no level is invented: the number, a plain comparison with public supply, and a note that the state's rules aren't reviewed. The Great Lakes Compact's review level applies to any place on the lakes or in their basin.
Mass and energy balances
In every hour of every run, the energy and water going into a campus equal what comes out.
Hourly energy balance per kW of IT load
Hourly water balance per kWh of IT load
The equations
- Energy:
facility power + outside air heat = heat through the water or coil + heat rejection fans - Heat through the water or coil:
H = q + air handler fans + outside air heat + chillers + pumps, withq = 1/UPS + 1/(1 − distribution loss) − 1 + lightingper kW of IT - Chillers:
load × (1 − economizer share) × (w / COP water-cooled + (1 − w) / COP air-cooled) - Tower fans:
design fan power × (air needed / design air)³, from 10% of design air to all of it, where air needed goes with the tower's water over the enthalpy the air can pick up. Design is the 78 °F rating wet-bulb [A]. Dry cooler fans follow the same law. - Outside air heat:
air flow × (enthalpy outside − enthalpy indoors). A dehumidifying coil carries the latent part. - Evaporation:
H × w × evaporative ratio / latent heat. Assist evaporates at pads instead, from the air's own energy balance:H × depression / (switch point + air rise − air temperature + depression) / latent heat, where depression is pad effectiveness × (air temperature − wet-bulb). - Drift:
H × w / (8.34 × range) × drift share - Blowdown:
evaporation / (cycles − 1) − drift, from the dissolved solids balance: makeup × solids = (blowdown + drift) × cycles × solids - Water:
withdrawn + condensate = consumed + returned. The middle estimate takes withdrawn and returned at their medians, and consumed is the remainder. - Lake-source: flow × density × specific heat × rise = heat = electricity, since the lake water is colder than the loops and needs no chillers or heat rejection fans [A]. Withdrawn equals returned at the pipe. The added heat then drives evaporation from the lake surface, so that balance is the lake's.
- Power plants, off site: generation = campus electricity / (1 − line loss). Plant water is generation × water per MWh generated, reported separately and never added to the campus's own water.
Terms
| IT load, IT capacity | The power the computers draw, and the most they can draw. Utilization is load over capacity. |
|---|---|
| Facility power, PUE | All the electricity the campus uses. Power usage effectiveness (PUE) is facility power over IT load. |
| Sensible and latent heat | Sensible heat changes the temperature of air or water. Latent heat evaporates or condenses water without changing its temperature, about 1,050 BTU per pound. |
| Enthalpy | The heat air carries, sensible and latent together. |
| Economizer | Cooling without running a chiller, when outside conditions are cold enough. |
| Chiller, COP | A machine that moves heat from cool water to warmer surroundings using electricity. Its coefficient of performance (COP) is heat moved per unit of electricity. |
| Wet share (w) | The share of the heat going through evaporation: 1 for towers, 0 for closed loop and assist coils, and rising with air temperature for hybrid. |
| Evaporative ratio | The share of a tower's heat that leaves by evaporation, the rest warming the air. It rises with air temperature (Rutberg et al. 2011, as in USGS SIR 2013-5188). |
| Range | How much a tower cools its water, °F. |
| Drift | Droplets carried out of a tower in the air. |
| Blowdown | Water drained from a tower to keep dissolved minerals from building up. Pads drain a similar bleed. |
| Cycles of concentration | How many times more concentrated the tower's water is than the water coming in. |
| Loop top-up | Water replacing small leaks from a closed loop. |
| Outside air | Air brought in to pressurize and ventilate the building. It is a small flow, 100–1,500 cfm per MW of IT capacity [A], not used for cooling. |
| Dew point, condensate | Air cooled to its dew point starts to condense. Above the 15 °C indoor limit, a coil removes the extra moisture as condensate, water that comes from the air and not from the water system. |
| Humidifier | Adds moisture when the air's dew point is below −9 °C. How many campuses do this is not published, so the share is sampled from none to all [A]. |
| Withdrawn, consumed, returned | The model's names for water taken; water evaporated or lost as droplets and leaks; and wastewater, sent to a sewer, septic system or stream. |
| Line loss | Electricity lost between power plants and the campus, about 5% (EIA, U.S. average 2018–2022). The national figure is used in every state, and a campus on the transmission system may lose less [A]. |
Model version 1.17 is used in every state. The Michigan methods page has the full parameter table with sources and compares the estimates with published and reported use: Michigan methods and sources.
Texas
Texas follows the overall method with national data throughout. What is particular to it:
Places. 1,227 cities, towns and villages; 254 counties. Counties are included so that unincorporated land is covered.
Water quality. Impairments and TMDLs from TCEQ's 2026 integrated report, through EPA ATTAINS.
Not yet covered: domestic wells and coldwater streams, labeled as such on its pages.
State rules
The calculator's legal lines in Texas, checked Nov 20, 2026. A line is context with a flag where an estimate exceeds it; it never changes a number. The water a line is tested on follows the rule's own measure and period.
| Line | Threshold | Tested on | Where | Source |
|---|---|---|---|---|
| Needs a district permit | more than 0 gal/day | water withdrawn, averaged over 30 days | statewide | Water Code ch. 36, Spec. Dist. Code 8801.155, Spec. Dist. Code 8834.206, TWDB district boundaries |
Discharge. TCEQ issues the permit (TPDES), and Texas’s standards limit warming above ambient to 5 °F in freshwater streams and 3 °F in lakes and reservoirs, outside the mixing zone the permit sets. 30 TAC 307.4
On-site sewage. An on-site sewage facility is permitted by the local authorized agent, or by TCEQ where there is none; a system treating more than 5,000 gallons a day on one property is outside the on-site sewage rules and may need a TCEQ permit. Health and Safety Code ch. 366, 30 TAC 285.3
Weather. 616 ERA5 cells cover Texas's places. 15 places sit on a cell less than half land and take the nearest cell at least half land. 18 cells less than 90% land are corrected toward shore stations and 545 at least 90% land toward inland stations (listed below); 7 shore cells and 46 inland cells have no such station within 100 km and keep ERA5 as it is.
| Station | Record | Hours observed, 1995–2024 | Cells corrected | Distance, km |
|---|---|---|---|---|
| East Texas Regional Arpt | NOAA ISD | 91% | 40 | 13–100 |
| Robert Gray Aff Airport | NOAA ISD, linked across station IDs | 98% | 39 | 11–100 |
| Easterwood Field Airport | NOAA ISD, linked across station IDs | 99% | 38 | 15–100 |
| Waco Regional Airport | NOAA ISD | 99.6% | 37 | 13–98 |
| Tyler Pounds Regional Arpt | NOAA ISD, linked across station IDs | 87% | 37 | 15–100 |
| Hooks Memorial Airpt | NOAA ISD, linked across station IDs | 94% | 35 | 9–98 |
| Angelina County Airport | NOAA ISD | 99.4% | 34 | 2–99 |
| Austin-Camp Mabry | NOAA ISD, linked across station IDs | 96% | 33 | 8–99 |
| Abilene Regional Airport | NOAA ISD | 99.6% | 33 | 12–98 |
| Ft Worth Meacham Intl Arpt | NOAA ISD, linked across station IDs | 97% | 33 | 14–99 |
| Dallas/Ft Worth International Ap | NOAA ISD | 100.0% | 33 | 12–98 |
| Lubbock International Airport | NOAA ISD | 99.9% | 33 | 12–100 |
| Austin-Bergstrom Intl Airport | NOAA ISD, linked across station IDs | 89% | 32 | 10–96 |
| G Bush Intercontinental Ap/Houston Ap | NOAA ISD | 100.0% | 31 | 11–90 |
| Dyess Air Force Base | NOAA ISD, linked across station IDs | 86% | 31 | 12–98 |
| Dallas Executive Airport | NOAA ISD, linked across station IDs | 94% | 30 | 14–96 |
| Amarillo Rick Husband Intl Airport | NOAA ISD | 99.8% | 30 | 4–94 |
| Stinson Minicipal Airport | NOAA ISD, linked across station IDs | 88% | 29 | 10–96 |
| Lackland Air Force Base (Kelly Field Annex) | NOAA ISD, linked across station IDs | 94% | 29 | 15–98 |
| Burnet Municipal Cradock Field Airport | NOAA ISD, linked across station IDs | 90% | 29 | 2–98 |
| Mineral Wells Airport | NOAA ISD | 93% | 29 | 7–96 |
| Mckinney Municipal Arpt | NOAA ISD, linked across station IDs | 87% | 29 | 11–92 |
| Fort Worth Alliance Arpt | NOAA ISD, linked across station IDs | 95% | 29 | 7–95 |
| San Antonio International Airport | NOAA ISD | 99.9% | 28 | 5–93 |
| William P. Hobby Airport | NOAA ISD, linked across station IDs | 99.0% | 27 | 12–99 |
| Fort Worth Naval Air Station Jrb/Carswell Field | NOAA ISD | 88% | 27 | 5–100 |
| Denton Municipal Airport | NOAA ISD, linked across station IDs | 88% | 25 | 7–96 |
| Randolph Afb Airport | NOAA ISD, linked across station IDs | 91% | 23 | 4–98 |
| Midland International Airport | NOAA ISD | 99.5% | 23 | 7–96 |
| San Angelo Regional/Maths Field Ap | NOAA ISD | 99.7% | 21 | 16–100 |
| Alice International Arpt | NOAA ISD, linked across station IDs | 96% | 20 | 3–96 |
| Victoria Regional Airport | NOAA ISD | 99.5% | 19 | 14–99 |
| Sheppard Afb/Wichita Falls Muni Ap | NOAA ISD | 99.6% | 19 | 2–95 |
| Childress Municipal Arpt | NOAA ISD, linked across station IDs | 98% | 19 | 9–94 |
| Kingsville Nas | NOAA ISD | 88% | 17 | 5–99 |
| Cotulla-La Salle Co Arpt | NOAA ISD | 90% | 17 | 5–98 |
| Hondo Municipal Airport | NOAA ISD | 94% | 17 | 14–96 |
| Shreveport Regional Airport | NOAA ISD | 99.9% | 17 | 18–98 |
| Shreveport Downtown Arpt | NOAA ISD, linked across station IDs | 90% | 17 | 24–100 |
| Municipal Airport | NOAA ISD, linked across station IDs | 98% | 17 | 5–99 |
| Kimble County Airport | NOAA ISD | 87% | 16 | 2–96 |
| Mc Allen Miller Intl Arpt | NOAA ISD | 98% | 15 | 8–91 |
| Corpus Christi International Airport | NOAA ISD | 99.9% | 15 | 3–97 |
| Winkler County Airport | NOAA ISD | 97% | 15 | 6–95 |
| Frederick Municipal Airpt | NOAA ISD, linked across station IDs | 86% | 15 | 27–98 |
| Fort Stockton-Pecos Co Apt | NOAA ISD, linked across station IDs | 88% | 14 | 13–98 |
| Texarkana Regional Airport-Webb Field | NOAA ISD | 99% | 13 | 5–97 |
| Valley International Arpt | NOAA ISD, linked across station IDs | 96% | 11 | 10–84 |
| Barksdale Air Force Base | NOAA ISD, linked across station IDs | 91% | 11 | 31–100 |
| Cannon Afb Airport | NOAA ISD, linked across station IDs | 89% | 11 | 32–99 |
| Altus Afb Airport | NOAA ISD, linked across station IDs | 88% | 11 | 44–98 |
| Lawton-Fort Sill Rgnl Arpt | NOAA ISD, linked across station IDs | 92% | 10 | 62–98 |
| Brownsville/S Padre Island Intl Ap | NOAA ISD | 99.6% | 9 | 12–91 |
| Palacios Municipal Airport | NOAA ISD | 98% | 8 | 3–90 |
| Scholes Intl At Glston Apt | NOAA ISD, linked across station IDs | 95% | 8 | 29–91 |
| Laughlin Afb Airport | NOAA ISD, linked across station IDs | 86% | 7 | 25–87 |
| Del Rio International Airport | NOAA ISD | 99.3% | 7 | 16–99 |
| Aransas County Airport | NOAA ISD, linked across station IDs | 93% | 5 | 19–91 |
| Southeast Texas Regional Airport | NOAA ISD | 99.6% | 5 | 6–97 |
| El Paso International Airport | NOAA ISD | 100.0% | 5 | 14–90 |
| Lake Charles Regional Airport | NOAA ISD | 99.4% | 4 | 76–99 |
| Clayton Municipal Airpark Airport | NOAA ISD | 99% | 4 | 15–97 |
| Corpus Christi Nas | NOAA ISD | 95% | 3 | 35–79 |
| Tucumcari Municipal Arpt | NOAA ISD, linked across station IDs | 86% | 3 | 78–94 |
| Clinton-Sherman Airport | NOAA ISD, linked across station IDs | 91% | 3 | 96–99 |
| Cavern City Air Trml Arpt | NOAA ISD | 98% | 2 | 80–96 |
| Hobart Municipal Airport | NOAA ISD | 97% | 2 | 90–92 |
Across the cells, the average day per 100 MW of IT capacity is 0.676–0.784 million gallons with cooling towers and 0.00558–0.108 with hybrid cooling (medians; cooling and loop water only, excluding staff use).
Power plant water by grid region
Water consumed at power plants per kWh of electricity used in the balancing authorities serving Texas, 2022 annual means weighted by hourly use (Siddik et al. 2024, from LBNL's Water IMPACT data). Water Ledger counts only the water that cools thermoelectric plants (the middle column). Counting hydropower reservoirs adds the water that evaporates from the lakes behind the dams; whether it belongs to the electricity or to a reservoir's other uses is disputed. The calculator's own factor is the state's mix from its plants' EIA-923 reports, also without reservoirs; this table is context.
| Balancing authority | Without reservoirs, L/kWh | With reservoirs, L/kWh |
|---|---|---|
| El Paso Electric (EPE) | 0.90 (0.24 gal) | 0.95 (0.25 gal) |
| ERCOT (ERCO) | 0.73 (0.19 gal) | 0.84 (0.22 gal) |
| Midcontinent ISO (MISO) | 1.57 (0.41 gal) | 3.84 (1.01 gal) |
| Public Service Company of New Mexico (PNM) | 0.74 (0.20 gal) | 1.11 (0.29 gal) |
| Southwest Power Pool (SWPP) | 0.94 (0.25 gal) | 3.70 (0.98 gal) |
For dry cooling to use as much water in total as cooling towers, counting the power plants, the plants making its extra electricity would have to consume more than about 9.6 gallons per kWh at Grand Rapids, 8.3 at Loudoun County, 5.7 at Dallas and 3.7 at Phoenix, on the shared loop (our calculation, model 1.17). In Western states, factors that count reservoirs can come near or above that. Near Phoenix, the power plant water for dry cooling's extra electricity is about 13% of what towers evaporate on site at the model's factors, 36% at WRI's factor for the Arizona and New Mexico region (1.31 gal/kWh, Reig et al. 2020), and about twice the towers' own at Torcellini et al.'s 7.85 gal/kWh for Arizona (NREL 2003).
Example: 300 MW of IT capacity in Austin
Million gallons per day, median with the 10th–90th percentile range. Consumed water is evaporated or otherwise not returned. Source and wastewater are the defaults described above (muni: community water system; sewer: nearest sewer plant).
| Design | Withdrawn, average day | Withdrawn, 1-in-10-year peak day | Consumed, average day | Source / wastewater |
|---|---|---|---|---|
| Cooling towers | 2.24 (1.79–2.78) | 2.93 (2.37–3.6) | 1.77 (1.39–2.11) | muni / sewer |
| Hybrid | 0.177 (0.113–0.263) | 1.58 (1.25–1.96) | 0.134 (0.0864–0.197) | muni / sewer |
| Closed loop with assist | 0.228 (0.143–0.37) | 1.66 (1.21–2.27) | 0.179 (0.11–0.289) | muni / sewer |
| Closed loop | 0.00705 (<0.01–0.00985) | 0.00784 (<0.01–0.012) | <0.01 | muni / sewer |
Checks on this snapshot
Coverage of Texas's places: water system 95%, watersheds 100%, electric utility 100%, climate division 100%, a sewer plant within 40 km 99.3%. 50 randomly selected places were run through every step and cooling design with 0 errors. Most places without a mapped water system are rural areas on private wells.
Limits
These are screening estimates from public data, intended for comparing designs and sizes before an applicant's figures are available. They are not a substitute for facility design data, a utility capacity analysis or a permit review. Downstream paths are traced between HUC-12 watersheds, not along individual stream reaches. EPA assessments are from each state's most recent integrated report. Weather covers 1995–2024.
Planning-level hydrologic assessment. Not engineering design. Built with the open waterledger Python packages (waterledger 3.28.0). Northline Hydrology.