Georgia has a calculator on waterledger.org. The same data and estimates are available through the open waterledger Python packages, for example wl.place("Fayetteville city, GA"). Proposals and moratoria are tracked from public sources and checked against local documents where they can be found; each entry says when it rests on a news report.

Estimates

For any city, town, village, township or county in Georgia, Water Ledger estimates the water a data center campus of a given size and cooling design would withdraw, consume and return on an average day and on a 1-in-10-year peak day, and compares it with the local water system, sewer plant, downstream waters and electric utility. Everything in Water Ledger comes from public records, published sources and our own models. No client work or data appears here.

Data

SourceIn Georgia
PlacesCensus TIGERweb: incorporated places, county subdivisions that are governments, and counties697 (538 cities and towns; 159 counties)
Water supplyEPA community water system service areas, with SDWIS population and connections1,395 systems (96% of places have one mapped)
WastewaterEPA Clean Watersheds Needs Survey 2022 (design flow), matched to ECHO (recent flow, receiving water; active permits); ECHO's sewer plants the survey lacks478 plants (99.9% of places within 40 km of one)
Receiving watersUSGS Watershed Boundary Dataset; EPA ATTAINS (21GAEPD, 2026 report)547 downstream paths through 1,232 watersheds
WeatherERA5 hourly reanalysis, 1995–2024, by 0.25° cell, corrected near the shore toward NOAA ISD and ECCC stations222 cells
ClimateNOAA Atlas 14 design storms; NOAA Climate at a Glance rainfall; NOAA ISD stations by NOAA climate division for road-salt days9 climate divisions
EnergyHIFLD retail service territories (PNNL copy); EIA-861 sales and peaks; EIA-923 plant reports for power-plant water100 utilities; grid regions DUK, SEPA, SOCO, TVA

Overall method (all states)

  1. Weather. Hourly ERA5 reanalysis (Copernicus Climate Change Service, read from Open-Meteo's open copy), 1995–2024, for the 0.25° grid cell holding each place. Where that cell is less than half land, the place takes the nearest cell that is at least half land. Every cell's temperature and dew-point depression are corrected by quantile mapping, by calendar month and 3-hour block of the day, toward hourly records at up to four weather stations within 100 km (NOAA ISD, and Environment and Climate Change Canada near the border), weighted by inverse distance squared. Cells less than 90% land run cool next to shore stations, so they are corrected only toward stations that are themselves on the shore; cells at least 90% land, only toward stations inland. A cell with no such station keeps ERA5 as it is. Hybrid and assist estimates depend on the hottest hours and so are the ones the weather source moves most.
  2. Cooling water. Hourly temperature and humidity drive the heat rejected by the campus under four cooling designs: cooling towers; hybrid, evaporative in warm weather only; dry coolers with adiabatic pre-cooling above a switch point that follows the loop's temperature, an operator's setting [A]; and closed loop with no evaporative cooling. Evaporation is the heat load times the evaporative fraction of Rutberg et al. (2011), as used in the USGS cooling tower method. Blowdown and drift together are evaporation divided by cycles of concentration minus one (DOE FEMP). Drift is a fraction of circulating flow. Cycles are sampled from 3 to 6, from the studies of data center cooling (Lei and Masanet; Han et al.), above the two to four FEMP calls typical, since it says six or more is possible [A]; 2 to 4 would take about 17% more water, as blowdown. A hybrid is fully evaporative at each location's own 0.4% design dry-bulb. Pads run at full effectiveness above the switch point; a controller that wet them only as needed would evaporate less, 12–41% on average and 2–8% on the peak day by climate at model 1.6 [A]. How the cooling plant moves heat to these designs, the three plant setups the calculator offers and their combinations: how a data center is cooled.
  3. Uncertainty. Each estimate is 400 runs on a Latin hypercube, sampling the cooling parameters from published or estimated ranges; estimated ranges are marked [A]. We report the 10th, 50th and 90th percentiles, the range across assumptions, which is not a probability that the real value falls inside. Hybrid and assist results are noisy at 400 draws: on average days the median is good to about 10%, and the low end to about 42% in cool climates, where it is about 0.01 million gallons a day and should read as near zero. The peak day is the 1-in-10-year maximum day, taken as the 90th percentile of the annual maximum daily withdrawal, at average load over a load factor of 0.88–0.94. With every computer at capacity all day, an upper case in the package, it is about 1.4 times that for the evaporating designs. The middle estimate takes water withdrawn and wastewater at their medians, and water evaporated is the remainder, so the books close.
  4. Other water. Staff use, 10–30 gallons a person a day, scaled to the number of people on site; maintenance and cleaning, up to 2,000 gallons a day plus 2–20 per MW, bracketed by applicants' projections; make-up water for closed loops, which lose 1–5% of their volume a year to leaks; and water that moves with outside air, 100–1,500 cfm per MW [A]: condensate from humid air joins the wastewater, and humidifiers, sampled from none to all [A], add water in very dry air.
  5. Water source. If a community water system is mapped in the place, the campus is served by it. Where several are mapped, the comparison uses one covering at least half of the place (the largest share if more than one), otherwise the largest by population among those covering at least 5%, otherwise the largest by population [A]. Where that system has under 100 connections and covers under half of the place [A], no percent is shown, and the page says a campus would need a larger supply. Another system covering at least a quarter of the place is named; the percent stays the main system's. If none covers 5% of the place, a closed loop connects to the nearest system serving more than 3,300 people when the edge of its service area is within 10 km. All other cases use new wells.
  6. Wastewater. Discharge goes to the nearest sewer plant if it is within reach and, for evaporative designs, has enough unused capacity for the blowdown. Otherwise closed loops use an on-site septic system and evaporative designs discharge directly.
  7. Homes. A home is the state's own water to homes over its households, USGS and the Census for 2015, indoors and out. EPA's figure of more than 300 gallons a day is a family's, a different basis.
  8. Runoff, sediment, phosphorus and nitrogen. Phosphorus and nitrogen by land cover: on developed land and the campus, the Simple Method with one concentration for the whole site from national outfall data, and natural land's yield below the pervious part; on farm fields, USDA's modeled loss per acre by region; on natural land, measured basin yields. Two cases everywhere: no controls and typical stormwater ponds that keep a permanent pool of water (wet ponds). These cover only the change in runoff from the finished site, and a study of the site can move them a lot. Sediment today on farm fields and woods is a yield, the state's cropland erosion (USDA NRI 2022) or EPA's natural range for woods, times a delivery ratio [A], because runoff concentrations miss soil scoured off the ground. Construction is EPA's gross erosion times a delivery ratio [A], with and without sediment basins; the gross erosion itself is shown separately and isn't comparable with today. Road salt comes from each location's cold wet days. These are screening estimates: a study with site soils and slopes would do better.
  9. Downstream. The place's main HUC-12 watershed is traced downstream for up to 25 watersheds, across state lines where needed, with the EPA-listed impairments and TMDLs for each.
  10. Not counted. The calculator covers the campus's water, electricity and runoff on the site. It does not count new water or sewer connections, power lines, access roads or other construction beyond the site.
  11. Electricity use. Worked out hour by hour from the same weather and heat balance as the cooling water, after Lei and Masanet (2022): computers, power losses, fans that slow to the air the hour needs, pumps, and chillers when outside air is too warm. So it varies by place and design. Some inputs are assumptions, marked [A], including how much of a campus is liquid-cooled. The peak is every computer running in the hottest hour of a typical decade. The base overhead every design shares, uninterruptible power supplies at 0.90–0.99 efficiency (Lei and Masanet; LBNL 2024), distribution losses, lighting and air handler fans, puts a campus on cooling towers at a yearly PUE of about 1.14–1.18. That is above the largest operators' fleets (Google about 1.09, Meta 1.08) and below Uptime Institute's 2025 survey average for sites of 20 MW or more (1.44). It is kept as a planning estimate [A]; it moves every design together, so it does not change the difference between them.
  12. Electricity. The utilities whose territories cover the place, their sales and peak loads, and the water consumed per kWh by each state's power plants: their 2024 reports to EIA, with published factors (Macknick et al. 2012) where a report is implausible or missing, weighted for power the state imports, and updated with 2022 reports and Siddik et al. (2024) on the same basis. Power plant water is reported separately from on-site use. It is the water that cools thermoelectric plants, from their reports to EIA (Form EIA-923); evaporation from hydropower reservoirs is not counted. Each state's page gives its grid regions both ways. In Western states, counting reservoirs can reverse the comparison of dry cooling with towers. A reported peak below a utility's average load cannot be right and counts as missing. Utilities from the national retail territory layer are ordered by number of customers, because it draws many small utilities as whole counties.
  13. State layers. A state can add its own data and rules (reported water use, domestic wells, coldwater streams, state rules) on top of this method. The calculator is a what-if: limits never change a number. Where a state's rules are reviewed, a legal line is context, with a flag when the estimate exceeds it. Where they aren't, no level is invented: the number, a plain comparison with public supply, and a note that the state's rules aren't reviewed. The Great Lakes Compact's review level applies to any place on the lakes or in their basin.

Mass and energy balances

In every hour of every run, the energy and water going into a campus equal what comes out.

Hourly energy balance per kW of IT load

INTHROUGH THE CAMPUSOUTOutside airIts heat and moisture: adds heatwhen hot or humid, takes someaway when cool or dryElectricityComputers (IT load)Power losses and lightingAir handler fansChillersPumpsHeat rejection fansHeat in the water or coilAn economizer carries whatthe weather allows; chillerscarry the rest and add theirown power. Air handler fansand pumps end up here too.A coil colder than the indoordew point removes moisturefrom outside air.Evaporationwet share × evaporative ratioWarm air from a towerwet share × (1 − ratio)Warm air from a dry cooler1 − wet shareWarm air from the fansstraight to the exhaustElectricity + heat from outside air = evaporation + warm air

Hourly water balance per kWh of IT load

INTHROUGH THE CAMPUSOUTWater takenFrom a water system, wellsor a lakeMoisture in outside airWhat the coil condensesTower or padsEvaporation, drift, blowdownLoop top-ups (small leaks)Humidifiers, in very dry airStaff and maintenanceRestrooms, kitchens, cleaningDehumidifying coil, in humid airMakes condensateEvaporated or lostEvaporationDriftLeaks from the loopHumidifier vaporA small part of staff waterWastewaterBlowdownCondensateMost staff and maintenancewaterTo a sewer, a septic systemor a stream, by the siteWater taken + condensate = water evaporated or lost + wastewater
Diagrams, not to scale. They describe the air- and water-cooled designs. Which paths carry anything depends on the design and the hour: closed loop has no tower or pads, and assist evaporates at pads ahead of a dry cooler. These balances hold in every hour of every run. Ranges are percentiles, and the ends of a range need not add up, but the middle estimates do.

The equations

  • Energy: facility power + outside air heat = heat through the water or coil + heat rejection fans
  • Heat through the water or coil: H = q + air handler fans + outside air heat + chillers + pumps, with q = 1/UPS + 1/(1 − distribution loss) − 1 + lighting per kW of IT
  • Chillers: load × (1 − economizer share) × (w / COP water-cooled + (1 − w) / COP air-cooled)
  • Tower fans: design fan power × (air needed / design air)³, from 10% of design air to all of it, where air needed goes with the tower's water over the enthalpy the air can pick up. Design is the 78 °F rating wet-bulb [A]. Dry cooler fans follow the same law.
  • Outside air heat: air flow × (enthalpy outside − enthalpy indoors). A dehumidifying coil carries the latent part.
  • Evaporation: H × w × evaporative ratio / latent heat. Assist evaporates at pads instead, from the air's own energy balance: H × depression / (switch point + air rise − air temperature + depression) / latent heat, where depression is pad effectiveness × (air temperature − wet-bulb).
  • Drift: H × w / (8.34 × range) × drift share
  • Blowdown: evaporation / (cycles − 1) − drift, from the dissolved solids balance: makeup × solids = (blowdown + drift) × cycles × solids
  • Water: withdrawn + condensate = consumed + returned. The middle estimate takes withdrawn and returned at their medians, and consumed is the remainder.
  • Lake-source: flow × density × specific heat × rise = heat = electricity, since the lake water is colder than the loops and needs no chillers or heat rejection fans [A]. Withdrawn equals returned at the pipe. The added heat then drives evaporation from the lake surface, so that balance is the lake's.
  • Power plants, off site: generation = campus electricity / (1 − line loss). Plant water is generation × water per MWh generated, reported separately and never added to the campus's own water.

Terms

IT load, IT capacityThe power the computers draw, and the most they can draw. Utilization is load over capacity.
Facility power, PUEAll the electricity the campus uses. Power usage effectiveness (PUE) is facility power over IT load.
Sensible and latent heatSensible heat changes the temperature of air or water. Latent heat evaporates or condenses water without changing its temperature, about 1,050 BTU per pound.
EnthalpyThe heat air carries, sensible and latent together.
EconomizerCooling without running a chiller, when outside conditions are cold enough.
Chiller, COPA machine that moves heat from cool water to warmer surroundings using electricity. Its coefficient of performance (COP) is heat moved per unit of electricity.
Wet share (w)The share of the heat going through evaporation: 1 for towers, 0 for closed loop and assist coils, and rising with air temperature for hybrid.
Evaporative ratioThe share of a tower's heat that leaves by evaporation, the rest warming the air. It rises with air temperature (Rutberg et al. 2011, as in USGS SIR 2013-5188).
RangeHow much a tower cools its water, °F.
DriftDroplets carried out of a tower in the air.
BlowdownWater drained from a tower to keep dissolved minerals from building up. Pads drain a similar bleed.
Cycles of concentrationHow many times more concentrated the tower's water is than the water coming in.
Loop top-upWater replacing small leaks from a closed loop.
Outside airAir brought in to pressurize and ventilate the building. It is a small flow, 100–1,500 cfm per MW of IT capacity [A], not used for cooling.
Dew point, condensateAir cooled to its dew point starts to condense. Above the 15 °C indoor limit, a coil removes the extra moisture as condensate, water that comes from the air and not from the water system.
HumidifierAdds moisture when the air's dew point is below −9 °C. How many campuses do this is not published, so the share is sampled from none to all [A].
Withdrawn, consumed, returnedThe model's names for water taken; water evaporated or lost as droplets and leaks; and wastewater, sent to a sewer, septic system or stream.
Line lossElectricity lost between power plants and the campus, about 5% (EIA, U.S. average 2018–2022). The national figure is used in every state, and a campus on the transmission system may lose less [A].

Model version 1.17 is used in every state. The Michigan methods page has the full parameter table with sources and compares the estimates with published and reported use: Michigan methods and sources.

Georgia

Georgia follows the overall method with national data throughout. What is particular to it:

Places. 538 cities and towns; 159 counties. Counties are included so that unincorporated land is covered.

Water quality. Impairments and TMDLs from 21GAEPD's 2026 integrated report, through EPA ATTAINS.

Not yet covered: domestic wells and coldwater streams, labeled as such on its pages.

State rules

The calculator's legal lines in Georgia, checked Nov 20, 2026. A line is context with a flag where an estimate exceeds it; it never changes a number. The water a line is tested on follows the rule's own measure and period.

LineThresholdTested onWhereSource
Needs a state permitmore than 100,000 gal/daywater withdrawn, averaged over 30 daysstatewideO.C.G.A. 12-5-31, O.C.G.A. 12-5-96, Ga. Comp. R. & Regs. 391-3-6-.07, Ga. Comp. R. & Regs. 391-3-2

Discharge. Georgia EPD issues the permit, and Georgia’s water quality standards cap a discharge’s warming of a stream at 5 °F (1.5 °F in estuaries) and 90 °F, with no warming at all in primary trout waters. Ga. Comp. R. & Regs. 391-3-6-.06, Ga. Comp. R. & Regs. 391-3-6-.03

Large loads. At 100 MW or more, a new customer of Georgia Power falls under the rules the PSC approved in January 2025 (Docket 44280): minimum bills, longer contracts, security, and each contract filed with the PSC at least 30 days before it is signed. PSC Docket 44280, PSC Docket 44280, Apr 15, 2025, Georgia Power filing, Docket 44280

On-site sewage. The county board of health issues the construction permit under the Department of Public Health’s rules; above 2,000 gallons a day the plans go to the county board of health signed by a Georgia-licensed engineer, and EPD permits large community systems of 10,000 to 150,000 gallons a day under a general permit. Ga. Comp. R. & Regs. 511-3-1-.03, EPD General Permit GAG278000

Weather. 222 ERA5 cells cover Georgia's places. 1 places sit on a cell less than half land and take the nearest cell at least half land. 4 cells less than 90% land are corrected toward shore stations and 216 at least 90% land toward inland stations (listed below); 1 shore cell and 1 inland cell have no such station within 100 km and keep ERA5 as it is.

StationRecordHours observed, 1995–2024Cells correctedDistance, km
Sw Georgia Regional ArptNOAA ISD, linked across station IDs89%436–97
Bacon County AirportNOAA ISD, linked across station IDs90%414–100
Middle Georgia Regional AirportNOAA ISD99.7%4011–98
Robins Afb AirportNOAA ISD, linked across station IDs97%3816–99
Dekalb-Peachtree AirportNOAA ISD, linked across station IDs91%3414–98
Lee Gilmer Memorial ArptNOAA ISD, linked across station IDs89%338–100
Hartsfield-Jackson Atlanta Intl ApNOAA ISD99.9%3214–97
Athens/Ben Epps AirportNOAA ISD99.7%329–97
Dobbins Air Reserve Base AirportNOAA ISD, linked across station IDs89%329–96
Moody Afb AirportNOAA ISD, linked across station IDs90%316–97
Fulton Co-Brown Fld ArptNOAA ISD, linked across station IDs92%294–91
Pchtre Cty-Falcon Fld ArptNOAA ISD, linked across station IDs94%2613–96
Valdosta Regional AirportNOAA ISD, linked across station IDs97%254–96
Columbus Metro AirportNOAA ISD99.4%2418–95
Augusta Regional At Bush Field ApNOAA ISD99%2313–100
Daniel Field AirportNOAA ISD, linked across station IDs90%2320–94
Lawson Aaf AirportNOAA ISD, linked across station IDs95%2225–96
Richard B Russell AirportNOAA ISD, linked across station IDs95%1914–95
Anderson Regional AirportNOAA ISD, linked across station IDs96%1838–99
Savannah/Hilton Head Intl AirportNOAA ISD99.9%1714–100
Hunter Army AirfieldNOAA ISD, linked across station IDs97%1511–100
Lovell Field AirportNOAA ISD99.9%146–92
Tallahassee Regional AirportNOAA ISD99.8%1242–96
Dothan Regional AirportNOAA ISD, linked across station IDs97%1143–96
Jacksonville International AirportNOAA ISD100.0%829–99
Cairns Army Airfield (Fort Rucker)NOAA ISD, linked across station IDs96%668–97
Anniston Metropolitan ArptNOAA ISD98%556–86
Jacksonville NasNOAA ISD98%458–86
Malcolm Mc Kinnon AirportNOAA ISD93%315–46
Greenville Downtown ArptNOAA ISD, linked across station IDs92%384–91
Mc Ghee Tyson AirportNOAA ISD99.9%391–94
Mayport NafNOAA ISD89%240–95
Asheville Regional AirportNOAA ISD99.8%281–100
Craig Municipal AirportNOAA ISD, linked across station IDs96%146–46
Beaufort McasNOAA ISD96%160–60
Greenville-Spartanburg Intl AirportNOAA ISD99.9%195–95

Across the cells, the average day per 100 MW of IT capacity is 0.682–0.748 million gallons with cooling towers and 0.00596–0.045 with hybrid cooling (medians; cooling and loop water only, excluding staff use).

Power plant water by grid region

Water consumed at power plants per kWh of electricity used in the balancing authorities serving Georgia, 2022 annual means weighted by hourly use (Siddik et al. 2024, from LBNL's Water IMPACT data). Water Ledger counts only the water that cools thermoelectric plants (the middle column). Counting hydropower reservoirs adds the water that evaporates from the lakes behind the dams; whether it belongs to the electricity or to a reservoir's other uses is disputed. The calculator's own factor is the state's mix from its plants' EIA-923 reports, also without reservoirs; this table is context.

Balancing authorityWithout reservoirs, L/kWhWith reservoirs, L/kWh
Duke Energy Carolinas (DUK)1.35 (0.36 gal)15.44 (4.08 gal)
Southeastern Power Administration (SEPA)1.73 (0.46 gal)11.81 (3.12 gal)
Southern Company (SOCO)1.52 (0.40 gal)8.26 (2.18 gal)
Tennessee Valley Authority (TVA)0.96 (0.25 gal)3.48 (0.92 gal)

For dry cooling to use as much water in total as cooling towers, counting the power plants, the plants making its extra electricity would have to consume more than about 9.6 gallons per kWh at Grand Rapids, 8.3 at Loudoun County, 5.7 at Dallas and 3.7 at Phoenix, on the shared loop (our calculation, model 1.17). In Western states, factors that count reservoirs can come near or above that. Near Phoenix, the power plant water for dry cooling's extra electricity is about 13% of what towers evaporate on site at the model's factors, 36% at WRI's factor for the Arizona and New Mexico region (1.31 gal/kWh, Reig et al. 2020), and about twice the towers' own at Torcellini et al.'s 7.85 gal/kWh for Arizona (NREL 2003).

Example: 300 MW of IT capacity in Fayetteville

Million gallons per day, median with the 10th–90th percentile range. Consumed water is evaporated or otherwise not returned. Source and wastewater are the defaults described above (muni: community water system; sewer: nearest sewer plant).

DesignWithdrawn, average dayWithdrawn, 1-in-10-year peak dayConsumed, average daySource / wastewater
Cooling towers2.14 (1.71–2.66)2.87 (2.32–3.52)1.69 (1.33–2.02)muni / sewer
Hybrid0.0842 (0.0418–0.144)1.53 (1.21–1.87)0.0614 (0.0302–0.108)muni / sewer
Closed loop with assist0.0879 (0.0424–0.168)1.2 (0.859–1.72)0.0665 (0.0308–0.128)muni / sewer
Closed loop0.00707 (<0.01–0.00986)0.00833 (<0.01–0.0134)<0.01muni / sewer

Checks on this snapshot

Coverage of Georgia's places: water system 96%, watersheds 100%, electric utility 100%, climate division 100%, a sewer plant within 40 km 99.9%. 50 randomly selected places were run through every step and cooling design with 0 errors. Most places without a mapped water system are rural areas on private wells.

Limits

These are screening estimates from public data, intended for comparing designs and sizes before an applicant's figures are available. They are not a substitute for facility design data, a utility capacity analysis or a permit review. Downstream paths are traced between HUC-12 watersheds, not along individual stream reaches. EPA assessments are from each state's most recent integrated report. Weather covers 1995–2024.

Planning-level hydrologic assessment. Not engineering design. Built with the open waterledger Python packages (waterledger 3.28.0). Northline Hydrology.